Auckland Airport pavements were originally constructed in 1964 and have long served the New Zealand community and travelers the world over. However, the pavements were starting to show their age and some pavement needed to be replaced.
The problem crews faced was how to reconstruct part of the Auckland Airport airfield pavements with long-lasting, durable concrete without shutting down for normal concrete curing time. The solution was FasTrac 300 Cement.
FasTrac 300 Cement was utilized for all concrete production, allowing for rapid return to air traffic (3-4 hours) while also providing added strength for many years of additional service.